GLOWA Elbe III - Subproject 7: Use case 'Integrated Low water and flood management' - memory management and use of groundwater
Description:
'The monetary evaluation of alternatives in terms of water availability and water quality is ndertaken analogous to GLOWA Elbe II through evaluation functions, which are integrated as tools in the models of the impact analysis of the EET (WBalMO-Elbe, MONERIS-Elbe). The evaluation functions developed in GLOWA Elbe II for the German part of the river Elbe will be expanded in GLOWA Elbe III to missing aspects and then transferred to the Czech part of the Elbe region. In contrast to Phase II the water withdrawals from groundwater and distant water are considered in the scenario analysis in Phase III. For this purpose equivalent evaluation functions These are integrated in the model WBalMoin. Regarding the evaluation of the changed flood risks the model system of the BMBF project VERIS-Elbe will be accessed, which is also assessing evaluation algorithms of flood events. For the multi-criteria evaluation a criteria catalogue will be applied and developed furtheron , which considers not-monetary effects using specific criteria (for example for the minimum environmental flow). Their selection and weighting is done in dialogue with actors and concerned people analogous to phase II. The technical implementation of the multi-criteria analysis is done with the tool PRIMATES, which is based on the outranking methodology of PROMETHEE.'
Executive Institute:
Chair for Hydroecology and Water Economy Details of Chair for Hydroecology and Water Economy
Parent institution:
Brandenburg University of Technology (BTU) Details of (BTU) (Brandenburg)
Contract period:
01. 10. 2007 - 30. 09. 2010
Project budget:
197,471 €
Participating Institutions:
- Institute for Landscape Water Resources (ZALF-LWH) Details of ZALF-LWH
Collaborative Project:
GLOWA Elbe III 2007 - 2010 - Impact of global change on the water cycle in the Elbe region -- Details of GLOWA Elbe III 2007 - 2010 - Impact of global change on the water cycle in the Elbe region --
Funding Programme:
- BMBF - Global Change in the Hydrological Cycle Details of BMBF - Global Change in the Hydrological Cycle
Subject:
- Agricultural hydrology
- Resource management
Purpose of research:
Applied research
Funding Institutions:
- Federal Ministry of Education and Research (BMBF) Details of (BMBF)
Project Management Agency:
- Project Management Agency in the German Aerospace Center (PT-DLR) Details of PT-DLR


